Project Details
Based on the performed site visit on 25/5/2022 and the visual inspection carried out, the following Design and Execution of (–Kw) solar system providing (–A) during the day and providing (–A) at night time for 12 hrs, consisting of:
- 1 Growatt inverter 5.5KVA 48V
- 8 Tubular Acid BATTERY 280AHr 48V- Bavaria
- 9 PV PANEL 550 W - Jinko
- PV Cabling 4mm copper + full AC/DC full Protection Board
- Galvanized Steel Structure
- Control Panel